INSPECTION CHECK LIST FOR ELECTRICAL PANEL LV/MV
item Test Discriptions APPROVED
1 1)Visual Inspection  
2 1-1) Dimension control  
3          Width, Height, Deep   
4          Dimension panel gland plate  
5          Control fixing point panel to floor of switchgear room  
6 2-1) Painting control  
7          Painting thickness that shall be bigger than 70 micrometer less than 120  
8          Check damaged or scratch on panel painting  
9          Check shade or two paint on panel painting  
10          Comparing RAL of painting with requested  
11 3-1) Bus bar control  
12          Bus bar size  
13          Bus bar connection  
14          Phase sequence with colored labels  
15          Bus bar resistance and insulators   
16          Distance between phase/ phase, phase / earth   
17          Heat shrine on bus bar for insulation not happened damaged  
18          Painting on bus bar no happened damaged or scratch on it  
19 4-1) Mechanical control  
20          Opened and closed all door’s panel  
21           Easy Rack In/Out CB or Feeder  
22           Check Earth switch/Earth bus  
23           key Lock /casel key  
24           Interlock between the door and CB  
25           Electro Magnet interlock  for earth switch  
26           Screw and nut tightening torque values for EX: Screw Type M10 /40 NM      
27 5-1) Part list control  
28          Technical Specifications electrical  
29          Brand of electrical and mechanical equipment  
30          Quantity of electrical and mechanical equipment  
31 6-1) Front view Panel   
32          Control view digram with Panel  
33 2) Electrical Test  
34 1-2) wiring control  
35          All wire and cable with wire & cable show  
36          All wire number in two heads  
37          All tightened in terminals  
38          All terminal number  
39          All wire size  
40          All electrical equipment  Tag  
41          All doors shall be earthed to panel main structure  
42          All signals  colors and description
 
43          All feeder name  
44 2-2) Functional test  
45          All circuit shall be tested   
46          Check the transmissions contacts and signal to or of outside panel  
47          Check the correct operation lighting signal on panel door  
48          Check the correct operation lighting and space heater and force ventilation  
49 3-2) Protections and Measuring Equipment Test  
50 1-3-2) Secondary current Protection relay  
51              Test the correct operation ratio of CT  
52              Test the correct operation ratio of core balance  
53              Test the trip circuit operation TCS relay  
54              Current test block test  
55 2-3-2) Secondary Voltage Protection relay test  
56              Test the correct operation ratio of PT  
57              Voltage test block test  
58 3-3-3) built in protection relay in CB  
59              Inject voltage and current to CB  
60 3-3-4)Porotection relay or Transducer test  
61             Multi function relay /49/50/51N/86/76/..  
62             RTD cotroler test  
63             Current Transducer  
64             Voltage Transducer  
65 4-2) Dielectric tests  
66 1-4-2) Main circuit Megger test before Power frequency test/In Low voltage Panel with 1 KV DC in duration 1 minute ,shall be bigger than 5M ohme for each phase   L1 with L2, L3, N, PE /L2 with L1, L3, N, PE/L3 with L1, L2, N, PE/N with L1, L2, L3, PE  
67 2-4-2) Main circuit power frequency Test/injection 2.5KV – 50HZ for60 Sec .For switchgear rated insulation level 0.69 KV/for example :in Medium voltage injection  50KV – 50HZ for 60 Sec .For switchgear rated insulation level 24 KV ,Note:approving the report of test need no happen Arc in duration test  
68 3-4-2) Main circuit Megger test After Power frequency test In Low voltage Panel      according IEC61439-1/IEC 60947 standard with 1 kVDC in duration 1 minute,5M        ohme/In Medium voltage panel with 5 KV DC in duration 1 minute , shall be bigger than 10 M ohm  
Note For  the Dielectric tests  shall be all main CB rack in and closed and all PT and Surge arrester disconnected and all current circuit out put of secondary CT shall be closed